LOCATION: Dorset
SCOPE & EXECUTION
Activities included dismantling electrical and instrumentation components, pipework, staircases, handrails, and gratings. All removals were conducted in a controlled, structured manner, with careful logistical planning due to the site’s isolated location. Zero-harm safety standards were maintained throughout.
OUTCOME
The project was completed on schedule with zero incidents, all waste was segregated and disposed of per client requirements, and safety upheld throughout.