LOCATION: Humberside
SCOPE & EXECUTION
Activities included testing, commissioning, and cutover of both new and existing E&I systems, ensuring full integration with the main control room. Work also involved coordination with civil and structural teams for cable trenches, equipment supports, and switch room foundations, alongside site-wide cable pulling and termination of high- and low-voltage and instrumentation cabling.
OUTCOME
The project was delivered safely, efficiently, and in line with client standards. Rapid mobilisation ensured seamless, uninterrupted operations throughout.