LOCATION: Southern North Sea
SCOPE & EXECUTION
Our team delivered a comprehensive work pack solution, including:
· Offshore Site Survey
A dedicated Work Pack Engineer conducted a full platform survey to assess existing conditions and confirm installation requirements.
· Health, Safety & Environmental Compliance
All activities were aligned with strict offshore HSE standards, ensuring risks were iden-tified and mitigated at the planning stage.
· Equipment & Materials Specification
Detailed identification and documentation of all required equipment and materials to support seamless offshore execution.
· Planning & Construction Scheduling
Development of a structured construction timeline to optimise workflow, minimise downtime, and support project coordination.
· Drawings & Design Integration
Preparation and consolidation of all relevant drawings and design documentation to support accurate and efficient work pack compilation.
OUTCOME
The work pack was delivered on time and met all client expectations, enabling the installation scope to be executed safely, efficiently, and with minimal disruption to ongoing operations.